The Strategic Building Plan The Strategic Plan includes the following steps to construction, timeline and anticipated costs. Stage 1 – 2019 CFKP formed a Board of Directors and Committee. A dedicated fee free bank account was opened with the Commonwealth Bank. Stage 2 – 2020 Mumford Campus A double plot of Stool land was purchased at Mumford early 2020. Land …
Tag: Education
Architect plans – Army Donder’s school concept design
So what will the school and health centre look like? Learning is growth. Logo designed by Luke Wilkinson, OLOH School Architect’s drawing of the Mumford Health and Education Centre, (formerly the Gomoa Education Centre). Designed with the African environment in mind, featuring solar energy panels, water harvesting, grey water gardening, passive cooling and rammed earth walls. Designer: Army Donder. Army …