Ghana: Strategic Building Plan

5-Year-Plan

The Strategic Building Plan The Strategic Plan includes the following steps to construction, timeline and anticipated costs. Stage 1 – 2019 CFKP formed a Board of Directors and Committee. A dedicated fee free bank account was opened with the Commonwealth Bank. Stage 2 – 2020 Mumford Campus A double plot of Stool land was purchased at Mumford early 2020. Land …

Architect plans – Army Donder’s school concept design

So what will the school and health centre look like? Learning is growth. Logo designed by Luke Wilkinson, OLOH School Architect’s drawing of the Mumford Health and Education Centre, (formerly the Gomoa Education Centre). Designed with the African environment in mind, featuring solar energy panels, water harvesting, grey water gardening, passive cooling and rammed earth walls.  Designer: Army Donder. Army …

About the CFKP Team

Patriz Kerkenaar Naa Borley Atiaku III Director/Treasurer: Patricia Maureen Kerkenaar-Richards cansforkidsproject@gmail.com +61 (0) 421 212 629 Patricia is the founder and manager of the CFKP in Indonesia and Ghana, for the past decade. She works now as a temporary teacher in a part time capacity in various South Australian schools, and organizing multiple fundraising events, in the absence of recycling …